logo: COVID-19 soundscape


May 11, 2021: In front of Temporary Music Room of Fukushima University
The building for the music was under renovation, and therefore, music lessons and practices were done at the temporary prefabrication rooms whose sound insulation were not enough. In addition, as a measure for preventing infection of the COVID-19, all doors and windows were opened. So, the soundscape around the music rooms were chaotic. In this situation, some birds were twittering as usual.



Go to TOP PAGE