top

  Fukushima University: 27 June, 2018
top

Koji Nagahata



The Parking area in front of the building of Faculty of Economics and Business Administration
mp3     WAV




Memorandum
In light rain, removal of the radioactive contaminated materials stored in Fukushima University continued.
The work of the day was digging out the contaminated materials and packing them into flexible container. The contaminated materials (the black soil in the left photo) clearly decreased.
The radiation level at inside the working area was 0.09μSv/h. This level is quite low level, in sharp contrast with the level at the day before this day.



Top of the Fukushima Soundscapes