|
|
Memorandum
|
♦
|
Because reinforcement work of the buildings of lecture rooms will start in
Autumn, a prefabrication building will be build at the area where the
monitoring post is located. To build the prefab building, preparation of
building site has been doing.
|
♦
|
The monitoring post shows that the radiation level of the
day was 0.21 μSv/h.
|
|