top

  Fukushima University: 24 June, 2014
top

Koji Nagahata



The Central Sauare of the Fukushima University
mp3     WAV




Memorandum
Because reinforcement work of the buildings of lecture rooms will start in Autumn, a prefabrication building will be build at the area where the monitoring post is located. To build the prefab building, preparation of building site has been doing.
The monitoring post shows that the radiation level of the day was 0.21 μSv/h.



Top of the Fukushima Soundscapes